ZEMKA - garbage and clarification plant

Engineering / industrual facilities: Buildings

ProductBuildings
special bearings with a length of 30 m
tempered ceilings with a weight of 42 ton
CategoryEngineering / industrual facilities
ContractEmpl Bau, Mittersill
Product information

reconstruction of the hall with pre-fabricated elements from Rieder, may 2007

abnormal load of the oversized bearings
massive construction
tempered ceilings