environmental tunnel Liefering/Salzburg

Retaining walls: Raumgitterwand RGW (space grid wall) , Grünwand / Grünwall

ProductRaumgitterwand RGW (space grid wall)
Grünwand / Grünwall
480 m² plantable Raumgitterwand RGW/200-5 installation depth 200 cm
700 m² noise protection embankment on both sides "Grünwall"
CategoryRetaining walls
Contractfederal state government of Salzburg, highway headquarter
Product information

plantable Raumgitterwand and noise protection embankment on both sides, May 2001

Raumgitterwand
and Grünwall
highway A1 Salzburg
Description dimension size
report environmental tunnel Liefering 345 KB